Los Angeles, CA · Electrical Panel Upgrade

Electrical Panel Upgrade in Los Angeles

What it costs, what's permitted, and what to ask before you hire.

Last verified: 2026-05-31 · Well-sourced

Panel / electrical
Verify your panel capacity with an electrician
Permit likelihood
Confirm with your building department

Permit snapshot

electrical permit

As of 2026-05-31, residential electrical service panel upgrades in the City of Los Angeles require an electrical permit from the Los Angeles Department of Building and Safety (LADBS), typically filed by a C-10 licensed electrical contractor registered with LADBS. Service-panel replacements at the existing service location within defined ampacity limits (typically up to 400 A residential) and with no structural modification typically qualify for an LADBS Express Permit issued online via PermitLA. Upgrades that increase ampacity, relocate the service mast, or require structural work route through ePlanLA plan check, and service modifications must be coordinated with LADWP (the municipal utility) under their service connection / re-energization process. Verify current Express Permit ampacity limits and LADWP coordination steps with LADBS and LADWP before scheduling the upgrade.

Verified 2026-05-31 · Los Angeles Department of Building and Safety · Los Angeles Department of Building and Safety · Los Angeles Department of Building and Safety

Before you sign, ask

Contractor question bank coming soon for this project.

Download the Los Angeles Electrical Panel Upgrade Decision Pack →